Lower part of progress bar range - always zero
Namespace: Autodesk.Revit.DB.EventsAssembly: RevitAPI (in RevitAPI.dll) Version: 23.0.0.0 (23.1.0.0)
Since: 2013
Syntax
C# |
---|
public int LowerRange { get; } |
Visual Basic |
---|
Public ReadOnly Property LowerRange As Integer Get |
Visual C++ |
---|
public: property int LowerRange { int get (); } |