AssemblyViewUtilsCreateMaterialTakeoff(Document, ElementId, ElementId, Boolean) Method |
Creates a new material takeoff multicategory schedule assembly view for the assembly instance.
Namespace: Autodesk.Revit.DBAssembly: RevitAPI (in RevitAPI.dll) Version: 25.0.0.0 (25.0.0.0)
Syntaxpublic static ViewSchedule CreateMaterialTakeoff(
Document document,
ElementId assemblyInstanceId,
ElementId viewTemplateId,
bool isAssigned
)
Public Shared Function CreateMaterialTakeoff (
document As Document,
assemblyInstanceId As ElementId,
viewTemplateId As ElementId,
isAssigned As Boolean
) As ViewSchedule
public:
static ViewSchedule^ CreateMaterialTakeoff(
Document^ document,
ElementId^ assemblyInstanceId,
ElementId^ viewTemplateId,
bool isAssigned
)
static member CreateMaterialTakeoff :
document : Document *
assemblyInstanceId : ElementId *
viewTemplateId : ElementId *
isAssigned : bool -> ViewSchedule
Parameters
- document Document
-
The document to which the view will be added.
- assemblyInstanceId ElementId
-
Id of the assembly instance that owns the new view.
- viewTemplateId ElementId
-
Id of the view template that is used to create the view;
if invalidElementId, the view will be created with the default settings.
- isAssigned Boolean
-
If true, the template will be assigned, if false, the template will be applied.
Return Value
ViewSchedule
A new material takeoff multicategory schedule assembly view.
ExceptionsException | Condition |
---|
ArgumentException |
assemblyInstanceId is not an AssemblyInstance.
-or-
viewTemplateId is not a correct view template for the schedule view.
|
ArgumentNullException |
A non-optional argument was null
|
ModificationForbiddenException |
The document is in failure mode: an operation has failed,
and Revit requires the user to either cancel the operation
or fix the problem (usually by deleting certain elements).
-or-
The document is being loaded, or is in the midst of another
sensitive process.
|
ModificationOutsideTransactionException |
The document has no open transaction.
|
Remarks
The material takeoff schedule will be preloaded with fields "Material: Name" and "Material: Volume".
The document must be regenerated before using the schedule.
See Also