Creates a material takeoff.
Namespace: Autodesk.Revit.DBAssembly: RevitAPI (in RevitAPI.dll) Version: 21.0.0.0 (21.1.1.109)
Since: 2013
Syntax
C# |
---|
public static ViewSchedule CreateMaterialTakeoff( Document document, ElementId categoryId ) |
Visual Basic |
---|
Public Shared Function CreateMaterialTakeoff ( _ document As Document, _ categoryId As ElementId _ ) As ViewSchedule |
Visual C++ |
---|
public: static ViewSchedule^ CreateMaterialTakeoff( Document^ document, ElementId^ categoryId ) |
Parameters
- document
- Type: Autodesk.Revit.DB..::..Document
The document to which the new schedule will be added.
- categoryId
- Type: Autodesk.Revit.DB..::..ElementId
The ID of the category whose elements will be included in the schedule, or InvalidElementId for a multi-category schedule.
Return Value
The newly created schedule.
Remarks
A material takeoff is a schedule that displays information about
the materials that make up elements in the model. Unlike regular
schedules where each row (before grouping) represents a single
element, each row in a material takeoff represents a single
<element, material> pair.
Exceptions
Exception | Condition |
---|---|
Autodesk.Revit.Exceptions..::..ArgumentException | document is not a project document. -or- categoryId is not a valid category for a material takeoff. |
Autodesk.Revit.Exceptions..::..ArgumentNullException | A non-optional argument was NULL |
Autodesk.Revit.Exceptions..::..ModificationForbiddenException | The document is in failure mode: an operation has failed, and Revit requires the user to either cancel the operation or fix the problem (usually by deleting certain elements). -or- The document is being loaded, or is in the midst of another sensitive process. |
Autodesk.Revit.Exceptions..::..ModificationOutsideTransactionException | The document has no open transaction. |